<
From version < 45.49 >
edited by Xiaoling
on 2024/08/06 13:56
To version < 45.48 >
edited by Xiaoling
on 2024/08/06 13:55
>
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -256,30 +256,27 @@
256 256  
257 257  == 2.2 Wiring ==
258 258  
259 -
260 260  [[image:image-20240720172548-2.png||height="348" width="571"]]
261 261  
262 262  
263 263  == (% style="color:inherit; font-family:inherit" %)2.3 (% style="color:inherit; font-family:inherit; font-size:26px" %)Mechinical Drawing(%%) ==
264 264  
265 -
266 266  [[image:image-20240714174241-2.png]]
267 267  
268 268  
269 269  == 2.4 Installation Notice ==
270 270  
271 -
272 272  Do not power on while connect the cables. Double check the wiring before power on.
273 273  
274 274  Installation Photo as reference:
275 275  
276 -**Submerged installation:**
273 +**~ Submerged installation:**
277 277  
278 278  The lead wire of the equipment passes through the waterproof pipe, and the 3/4 thread on the top of the equipment is connected to the 3/4 thread of the waterproof pipe with raw tape. Ensure that the top of the equipment and the equipment wire are not flooded.
279 279  
280 280  [[image:image-20240718191348-6.png]]
281 281  
282 -**Pipeline installation:**
279 +**~ Pipeline installation:**
283 283  
284 284  Connect the equipment to the pipeline through the 3/4 thread.
285 285  
Copyright ©2010-2024 Dragino Technology Co., LTD. All rights reserved
Dragino Wiki v2.0