Changes for page LT-22222-L -- LoRa I/O Controller User Manual
Last modified by Saxer Lin on 2025/04/15 17:24
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -19,8 +19,6 @@ 19 19 == 1.1 What is LT Series I/O Controller == 20 20 21 21 ((( 22 - 23 - 24 24 The Dragino (% style="color:blue" %)**LT series I/O Modules**(%%) are Long Range LoRaWAN I/O Controller. It contains different I/O Interfaces such as:** (% style="color:blue" %)analog current Input, analog voltage input(%%)**(% style="color:blue" %), **relay output**, **digital input**(%%) and (% style="color:blue" %)**digital output**(%%) etc. The LT I/O Modules are designed to simplify the installation of I/O monitoring. 25 25 ))) 26 26 ... ... @@ -50,7 +50,6 @@ 50 50 51 51 ))) 52 52 53 - 54 54 == 1.2 Specifications == 55 55 56 56 ((( ... ... @@ -167,6 +167,7 @@ 167 167 Packet engine up to 256 bytes with CRC. 168 168 ))) 169 169 167 + 170 170 == 1.3 Features == 171 171 172 172 * LoRaWAN Class A & Class C protocol ... ... @@ -177,6 +177,7 @@ 177 177 * Firmware upgradable via program port 178 178 * Counting 179 179 178 + 180 180 == 1.4 Applications == 181 181 182 182 * Smart Buildings & Home Automation ... ... @@ -186,6 +186,7 @@ 186 186 * Smart Cities 187 187 * Smart Factory 188 188 188 + 189 189 == 1.5 Hardware Variants == 190 190 191 191 (% border="1" style="background-color:#f7faff; width:500px" %) ... ... @@ -199,6 +199,7 @@ 199 199 * 1 x Counting Port 200 200 ))) 201 201 202 + 202 202 = 2. Power ON Device = 203 203 204 204 The LT controller can be powered by 7 ~~ 24V DC power source. Connect VIN to Power Input V+ and GND to power input V- to power the LT controller. ... ... @@ -279,6 +279,9 @@ 279 279 * **MOD5**: Single DI Counting + 2 x AVI + 1 x ACI + DO + RO 280 280 * **ADDMOD6**: Trigger Mode, Optional, used together with MOD1 ~~ MOD5 281 281 283 + 284 + 285 + 282 282 === 3.3.1 AT+MOD~=1, 2ACI+2AVI === 283 283 284 284 The uplink payload includes totally 9 bytes. Uplink packets use FPORT=2 and every 10 minutes send one uplink by default. ... ... @@ -332,6 +332,9 @@ 332 332 ** DO1 is high in case there is load between DO1 and V+. 333 333 ** DO1 LED is off in both case 334 334 339 + 340 + 341 + 335 335 === 3.3.2 AT+MOD~=2, (Double DI Counting) === 336 336 337 337 ... ... @@ -472,6 +472,8 @@ 472 472 473 473 ((( 474 474 Other AT Commands for counting are similar to [[MOD2 Counting Command>>||anchor="H3.3.2AT2BMOD3D22C28DoubleDICounting29"]]. 482 + 483 + 475 475 ))) 476 476 477 477 ... ... @@ -757,6 +757,7 @@ 757 757 ))) 758 758 759 759 769 + 760 760 == 3.4 Configure LT via AT or Downlink == 761 761 762 762 User can configure LT I/O Controller via AT Commands or LoRaWAN Downlink Commands ... ... @@ -2000,16 +2000,8 @@ 2000 2000 ))) 2001 2001 2002 2002 ((( 2003 - ==5.6 Why does the relay output become the default and open relay after the lt22222 is powered off? ==2013 + 2004 2004 2005 -If the device is not shut down, but directly powered off. 2006 - 2007 -It will default that this is a power-off state. 2008 - 2009 -In modes 2 to 5, DO RO status and pulse count are saved in flash. 2010 - 2011 -After restart, the status before power failure will be read from flash. 2012 - 2013 2013 = 6. Trouble Shooting = 2014 2014 ))) 2015 2015