Last modified by Xiaoling on 2025/04/27 16:45

From version 170.5
edited by Xiaoling
on 2022/06/15 09:46
Change comment: There is no comment for this version
To version 167.1
edited by Xiaoling
on 2022/06/15 09:20
Change comment: Uploaded new attachment "image-20220615092044-12.png", version {1}

Summary

Details

Page properties
Content
... ... @@ -102,7 +102,6 @@
102 102  
103 103  
104 104  
105 -
106 106  == 1.3  Suitable Container & Liquid ==
107 107  
108 108  * Solid Wall container such as: steel, iron, glass, ceramics, non-foaming plastics etc.
... ... @@ -123,111 +123,35 @@
123 123  
124 124  
125 125  
126 -== 1.5  Install LDDS20 ==
125 +== 1.5 ​ Applications ==
127 127  
127 +* Horizontal distance measurement
128 +* Liquid level measurement
129 +* Parking management system
130 +* Object proximity and presence detection
131 +* Intelligent trash can management system
132 +* Robot obstacle avoidance
133 +* Automatic control
134 +* Sewer
135 +* Bottom water level monitoring
128 128  
129 -(% style="color:blue" %)**Step 1**(%%):  Choose the installation point.
137 +== 1.6  Pin mapping and power on ==
130 130  
131 -LDDS20 (% style="color:red" %)**MUST**(%%) be installed on the container bottom middle position.
132 132  
133 -[[image:image-20220615091045-3.png]]
140 +[[image:1654847583902-256.png]]
134 134  
135 135  
136 136  
137 -(% style="color:blue" %)**Step 2**(%%):  Polish the installation point.
144 += 2.  Configure LDDS75 to connect to LoRaWAN network =
138 138  
139 -For Metal Surface with paint, it is important to polish the surface, first use crude sand paper to polish the paint level , then use exquisite sand paper to polish the metal level to make it shine & smooth.
140 -
141 -[[image:image-20220615092010-11.png]]
142 -
143 -
144 -No polish needed if the container is shine metal surface without paint or non-metal container.
145 -
146 -[[image:image-20220615092044-12.png]]
147 -
148 -
149 -(% style="color:blue" %)**Step3:   **(%%)Test the installation point.
150 -
151 -Power on LDDS75, check if the blue LED is on, If the blue LED is on, means the sensor works. Then put ultrasonic coupling paste on the sensor and put it tightly on the installation point.
152 -
153 -
154 -It is necessary to put the coupling paste between the sensor and the container, otherwise LDDS20 won’t detect the liquid level.
155 -
156 -[[image:1655256160324-178.png]][[image:image-20220615092327-13.png]]
157 -
158 -
159 -After paste the LDDS20 well, power on LDDS20. In the first 30 seconds of booting, device will check the sensors status and BLUE LED will show the status as below. After 30 seconds, BLUE LED will be off to save battery life.
160 -
161 -
162 -(% style="color:red" %)**LED Status:**
163 -
164 -* Onboard LED: When power on device, the onboard LED will fast blink 4 times which means detect the sensor well.
165 -
166 -* (% style="color:blue" %)BLUE LED(% style="color:red" %) always ON(%%): Sensor is power on but doesn’t detect liquid. There is problem in installation point.
167 -* (% style="color:blue" %)BLUE LED(% style="color:red" %) slowly blinking(%%): Sensor detects Liquid Level, The installation point is good.
168 -
169 -LDDS20 will enter into low power mode at 30 seconds after system reset or power on, Blue LED will be off after that.
170 -
171 -
172 -(% style="color:red" %)**Note 2:**
173 -
174 -(% style="color:red" %)Ultrasonic coupling paste (%%) is subjected in most shipping way. So the default package doesn’t include it and user needs to purchase locally.
175 -
176 -
177 -(% style="color:blue" %)**Step4:   **(%%)Install use Epoxy ab glue.
178 -
179 -
180 -Prepare Eproxy AB glue.
181 -
182 -Put Eproxy AB glue in the sensor and press it hard on the container installation point.
183 -
184 -Reset LDDS20 and see if the BLUE LED is slowly blinking.
185 -
186 -[[image:image-20220615091045-8.png||height="226" width="380"]] [[image:image-20220615091045-9.png||height="239" width="339"]]
187 -
188 -
189 -(% style="color:red" %)**Note 1:**
190 -
191 -Eproxy AB glue needs 3~~ 5 minutes to stable attached. we can use other glue material to keep it in the position.
192 -
193 -
194 -(% style="color:red" %)**Note 2:**
195 -
196 -(% style="color:red" %)Eproxy AB glue(%%) is subjected in most shipping way. So the default package doesn’t include it and user needs to purchase locally.
197 -
198 -
199 -
200 -== 1.6 ​ Applications ==
201 -
202 -* Smart liquid control solution.
203 -* Smart liquefied gas solution.
204 -
205 -
206 -== 1.7  Precautions ==
207 -
208 -* At room temperature, containers of different materials, such as steel, glass, iron, ceramics, non-foamed plastics and other dense materials, have different detection blind areas and detection limit heights.
209 -* For containers of the same material at room temperature, the detection blind zone and detection limit height are also different for the thickness of the container.
210 -* When the detected liquid level exceeds the effective detection value of the sensor, and the liquid level of the liquid to be measured shakes or tilts, the detected liquid height is unstable.
211 -
212 -
213 -== 1.8  Pin mapping and power on ==
214 -
215 -
216 -[[image:1655257026882-201.png]]
217 -
218 -
219 -
220 -= 2.  Configure LDDS20 to connect to LoRaWAN network =
221 -
222 -
223 223  == 2.1  How it works ==
224 224  
225 225  (((
226 -The LDDS20 is configured as LoRaWAN OTAA Class A mode by default. It has OTAA keys to join LoRaWAN network. To connect a LoRaWAN network, you need to input the OTAA keys in the LoRaWAN IoT server and power on the LDDS75. If there is coverage of the LoRaWAN network, it will automatically join the network via OTAA and start to send the sensor value.
149 +The LDDS75 is configured as LoRaWAN OTAA Class A mode by default. It has OTAA keys to join LoRaWAN network. To connect a LoRaWAN network, you need to input the OTAA keys in the LoRaWAN IoT server and power on the LDDS75. If there is coverage of the LoRaWAN network, it will automatically join the network via OTAA and start to send the sensor value
227 227  )))
228 228  
229 229  (((
230 -In case you can't set the OTAA keys in the LoRaWAN OTAA server, and you have to use the keys from the server, you can [[use AT Commands >>||anchor="H3.A0UsingtheATCommands"]]to set the keys in the LDDS20.
153 +In case you can't set the OTAA keys in the LoRaWAN OTAA server, and you have to use the keys from the server, you can [[use AT Commands >>||anchor="H3.A0ConfigureLDDS75viaATCommandorLoRaWANDownlink"]]to set the keys in the LDDS75.
231 231  )))
232 232  
233 233  
1655256160324-178.png
Author
... ... @@ -1,1 +1,0 @@
1 -XWiki.Xiaoling
Size
... ... @@ -1,1 +1,0 @@
1 -177.0 KB
Content
1655257026882-201.png
Author
... ... @@ -1,1 +1,0 @@
1 -XWiki.Xiaoling
Size
... ... @@ -1,1 +1,0 @@
1 -492.6 KB
Content
image-20220615092327-13.png
Author
... ... @@ -1,1 +1,0 @@
1 -XWiki.Xiaoling
Size
... ... @@ -1,1 +1,0 @@
1 -66.3 KB
Content