Last modified by Mengting Qiu on 2023/12/14 11:15

From version 79.2
edited by Xiaoling
on 2023/06/13 14:31
Change comment: There is no comment for this version
To version 79.4
edited by Xiaoling
on 2023/06/13 14:39
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -122,7 +122,6 @@
122 122  [[image:image-20230613143125-6.png]]
123 123  
124 124  
125 -
126 126  (((
127 127  (% style="color:blue" %)**Step3:   **(%%)Test the installation point.
128 128  )))
... ... @@ -131,14 +131,10 @@
131 131  Power on DDS20-LB, check if the blue LED is on, If the blue LED is on, means the sensor works. Then put ultrasonic coupling paste on the sensor and put it tightly on the installation point.
132 132  )))
133 133  
134 -
135 135  (((
136 136  It is necessary to put the coupling paste between the sensor and the container, otherwise DDS20-LB won't detect the liquid level.
137 137  )))
138 138  
139 -[[image:1655256160324-178.png||height="151" width="419"]][[image:image-20220615092327-13.png||height="146" width="260"]]
140 -
141 -
142 142  (((
143 143  After paste the DDS20-LB well, power on DDS20-LB. In the first 30 seconds of booting, device will check the sensors status and BLUE LED will show the status as below. After 30 seconds, BLUE LED will be off to save battery life.
144 144  )))
... ... @@ -189,27 +189,18 @@
189 189  Reset DDS20-LB and see if the BLUE LED is slowly blinking.
190 190  )))
191 191  
192 -[[image:image-20220615091045-8.png||height="203" width="341"]] [[image:image-20220615091045-9.png||height="200" width="284"]]
187 +[[image:http://wiki.dragino.com/xwiki/bin/download/Main/User%20Manual%20for%20LoRaWAN%20End%20Nodes/LDDS20%20-%20LoRaWAN%20Liquid%20Level%20Sensor%20User%20Manual/WebHome/image-20220615091045-8.png?width=341&height=203&rev=1.1||alt="image-20220615091045-8.png"]] [[image:http://wiki.dragino.com/xwiki/bin/download/Main/User%20Manual%20for%20LoRaWAN%20End%20Nodes/LDDS20%20-%20LoRaWAN%20Liquid%20Level%20Sensor%20User%20Manual/WebHome/image-20220615091045-9.png?width=284&height=200&rev=1.1||alt="image-20220615091045-9.png"]]
193 193  
194 194  
195 195  (((
196 -(% style="color:red" %)**Note 1:**
191 +(% style="color:red" %)**Note 1:**(%%) Eproxy AB glue needs 3~~ 5 minutes to stable attached. we can use other glue material to keep it in the position.
197 197  )))
198 198  
199 199  (((
200 -Eproxy AB glue needs 3~~ 5 minutes to stable attached. we can use other glue material to keep it in the position.
195 +(% style="color:red" %)**Note 2:(%%) (% style="color:blue" %)Eproxy AB glue**(%%) is subjected in most shipping way. So the default package doesn't include it and user needs to purchase locally.
201 201  )))
202 202  
203 203  
204 -(((
205 -(% style="color:red" %)**Note 2:**
206 -)))
207 -
208 -(((
209 -(% style="color:red" %)**Eproxy AB glue**(%%) is subjected in most shipping way. So the default package doesn't include it and user needs to purchase locally.
210 -)))
211 -
212 -
213 213  == 1.6 Applications ==
214 214  
215 215